The soil investigation report handed for the structural engineer to the design of pile Basis purpose need to consist of the embedment length with the piles, the suggested measurements of the pile, the Protected Doing work load of each pile measurement, along with other facts Which may be necessary for https://maps.app.goo.gl/YojC2P1gNve8wSuB6