Still left: Within the VAB, the crawler transporter positions alone down below Cellular Launcher one in preparing for rollout of SA-501 to your start pad – Be aware the worker from the foreground for sizing comparison. On arrival on the Vertical Assembly Building, Every phase was inspected inside a https://zionxxvsp.glifeblog.com/32896447/the-2-minute-rule-for-apollo4-blue-plus